About
Peril Pty Ltd specialises in the commissioning of large (2MW and larger capacity pumps) water and waste water infrastructure projects. Peril Pty Ltd manages the design, commissioning and operation of water treatment, waste and reclamation plants and is a provider of other water project engineering services.

Peril Pty Ltd has worked on large infrastructure projects alongside Abi Group Contactors, Tallai Project Group and Water Partnership, as well as other major and minor contractors. With a combined 80 years experiences it is well practiced at commissioning to tight deadlines while remaining mindful of stake holder agendas and budgets.
Services and Capabilities
Commissioning
  • Pre commissioning
  • Functional testing
  • Process testing
  • Technical writing
    • Operation and maintenance manuals
    • Training manuals
  • Training including
    • Training coordination
    • End user operator training
    • End user maintenance training
    • Project staff training
  • Integration including
    • PLC programming
    • Technical writing
    • Functional specifications
Management
  • Plant operations
  • Commissioning
  • Plant construction
  • Alliance project management
  • Project management
  • Human resource acquisition and allocation

Safety
  • Compliance documentation
  • Audits
  • Lock out tag out systems
  • Safe work solutions
  • Training
Construction
  • Project engineering including
    • Planning and scheduling
    • Supervision of construction
    • Defect identification
    • Procurement

Design
  • Mechanical plant
  • Process design
  • Electrical design
Project Curricula
Southern Regional Water Pipeline Alliance (SRWPA) LinkWater, a State Government owned and incorporated company established to improve the regional water supply distribution network in South East Queensland contracted the SRWP Alliance to oversee the planning, design and construction of the project (SRWPA, Publications 2008). Peril Pty Ltd provided commissioning services to the SRWP program of projects.
Southern Regional Water Pipeline This reverse flow pipeline connects Brisbane to the Gold Coast delivering water to meet demand.

  • Supplied by Peril Pty Ltd:-
    • Commissioning manager
    • Program commissioning support and risk manager
    • Commissioning documentation manager
    • Commissioning training coordinator
    • Senior electrical commissioning engineer
Northern Pipeline Interconnector Stage 1 is intended to meet emergency drought mitigation by connecting Brisbane to the Sunshine Coast. Construction of stage 1 started in October 2007, and will be completed by March 2009.

  • Supplied by Peril Pty Ltd:-
    • Commissioning manager
    • Program commissioning support and risk manager
    • Commissioning documentation manager
    • Commissioning training coordinator
    • Senior electrical commissioning engineer
Eastern Pipeline Interconnector is planned to transport potable water between Logan City and Redland Shire, alleviating demands on Brisbane’s potable water infrastructure and the Wivenhoe and Somerset Dam storages.

  • Supplied by Peril Pty Ltd:-
    • Commissioning manager
    • Program commissioning support and risk manager
    • Commissioning documentation manager
    • Commissioning training coordinator
    • Senior electrical commissioning engineer
Peril Pty Ltd Project Team
The “Peril Water Team” capabilities range from principle engineering through to safety consultant services as well as a project management and administration team to allow for both engineering and project excellence. Key team members are presented below, detailed credentials can be provided on request.
Greg Peril Director
Principal Engineering Consultant

Over 12 years experience in the water and wastewater industry. Mr Peril’s most recent experience has been as a Senior Engineering Consultant working on projects that required both design and commissioning support within an alliance framework.

He has broad water and waste water industry experience and possesses “hands on” expertise in design, project management, commissioning and operations aspects of water projects.

Prior project work across a broad cross section of projects has provided an understanding of the needs of stakeholders from design through to commissioning and maintenance phases.

Anna Peril Director
Manager Safety

Ms Peril is an experienced Safety Manager and Queensland Industrial Relations Advocate. She contributed significantly during the development and drafting of nationally consistent legislation and Australian Standards for “Working at Heights”.

As a key player in the safety management, design, implementation, commissioning and operation of Coca Cola Amatil water line, canning line, and dangerous good facility ensuring these projects comply with AS4801 – safety system requirements and guidelines as set by National Safety Standards.

She has extensive construction experiences working in the construction and manufacturing industries for over 8 years.

News
Welcome to our new website. Our news section will be frequently updated with the happenings with Peril.
Peril Water Offices
p - 3341 1313 e - peril@bigpond.net.au
78 Underwood Road Eight Mile Plains QLD 4113